WI-95 WORK INSTRUCTION EDDY CURRENT TESTING , INSPECTION AND PROCESS APPROVAL

Doc. No:  KKM/GWI/95 EDDY CURRENT TESTING , INSPECTION AND PROCESS
APPROVAL WORK INSTRUCTION
Rev.  No.:  0
Rev. Date:   27/11/14

Take 10. No. of components from the batch for inspection by eddy current testing machine (ECT).

2- Ensure that the material of the parts, heat wise tested is ok.

3- Adjust the ECT as per material, with respect to the following-

  1. Material checking after Pre- machining
  2. All 10 no. are from one heat
  3. Material checking is done heat wise

4-Ensure that the sine curve generated by the master rejection sample show distinctly sine wave curve            in comparison with  10 ok parts checked by the master sample.

5- Take  trial with ok and not ok (out of tolerance) parts to see the behavior of sine wave curves.

6- If the results are ok give the clearance to the operators for segregation of the lot in ECT machine.