WI-23 Work Instruction For Tool/Die Re-Maintenance

Doc. No:  KKM/GWI/23 Tool/Die Re-Maintenance Work Instruction
Rev. No.:  01
Rev. Date:01.03.2012
  • Found any dimension is wear out then forward to Tool Room department.
  • Do Welding according to drawing parameters.
  • Do grinding and Polishing after welding. then prepare inspection report and forward to Production department.
  • After targeted production, if found oversize (0.5 to 1.0mm) do facing (5 mm) then prepare as per drawing parameter.
  • After modification prepare a plaster mold and do inspection and fill inspection report if Found ok then issue to production department.